Bal Harbour Paver Permits
Prepare a Bal Harbour paving project with Village guidance on exterior design review, driveway approaches, application documents and inspections.
A Bal Harbour paving proposal needs a clear boundary between the private-property work and the driveway approach. Design review and public right-of-way approval are important questions to resolve before planning the installation.
Official resources reviewed October 31, 2026. Confirm requirements for your address and scope before applying.
Check the exterior review sequence
The Village's Building Permits guidance lists driveways among exterior projects subject to Architectural Review Board approval before Building Department review. It describes a Certificate of Appropriateness following approval. Ask Building to confirm how that sequence applies to the proposed repair, replacement or new design.
The same page discusses concurrent review when Miami-Dade approvals are required. Confirm any outside-agency review for your property rather than assuming every driveway follows the same path.
Treat a paver approach as a separate scope
The Village's Right-of-Way page explicitly includes decorative paver driveway approaches among activities requiring a ROW permit. Its coverage includes public rights-of-way within the gated residential community, as well as Collins Avenue and 96th Street.
Show where the work crosses the property boundary. Include any proposed temporary use of a sidewalk or street in the discussion with Public Works. Follow the current ROW page for its application and submission instructions.
Use the Village forms and confirm submission instructions
The Building Documents page provides the permit application and site-plan submission resources. Gather the property address, owner authorization, proposed layout, material information and any existing review correspondence before requesting the applicable document list.
Village pages contain both older application instructions and newer online-service links. Confirm the current submission method with Building for your project; a portal account alone does not establish that every approval has been obtained.
Plan around approvals and the permit card
Request the current fee assessment and review status from the Village. This guide does not assign a flat permit cost or a two-to-three-week approval date. Design comments, ROW coordination and any county review should be resolved against the actual application.
The Village's inspection guidance says the issued permit card identifies required inspections and the permit holder must request them. Confirm those stages before work conceals anything that needs inspection.
Official Bal Harbour resources